Data centre decommissioning
From rack to dossier, in phased steps
When decommissioning a data centre, we first record every device by serial number, then dismantle rack by rack. Every drive in servers, storage and network equipment is erased or destroyed according to NIST SP 800-88; usable hardware goes on to remarketing, the rest to certified recycling.
030 123 45 67
Planning per rack, not all at once
A data centre does not need to be cleared in a single weekend. We plan the decommissioning in phases per rack or room, so critical systems stay online longer. Every device is recorded by serial number when de-racked, before it goes on to erasure, destruction or remarketing.
inventory by serial number
drives in servers, storage and network equipment erased or destroyed
planning per room or rack (example)

What happens per equipment type, and in which phase
On the left how we handle the various hardware in the data centre, on the right the phases of the decommissioning itself. Every device remains traceable by serial number, from de-racking to settlement.
- ServersErase · destroy
Dismantled, drives erased or destroyed per serial number
- Storage (SAN/NAS)Erase · destroy
All drives erased or destroyed before further processing
- Network equipmentErase · destroy
Internal storage, if present, erased or destroyed
- Racks and cablingRecycling
Dismantled, materials separated for recycling
- Loose storage mediaErase · destroy
Loose tapes, SSDs and HDDs delivered, registered separately
- InventoryRegistration
Every device recorded by serial number before removal from the rack
- De-rackingPhased
Rack by rack, planned in consultation around your critical systems
- TransportSealed
Sealed transport with a transfer receipt
- RemarketingResidual value
Usable servers and storage valued and bought back
- RecyclingCertified
Non-usable hardware to separated material streams
How a data centre decommissioning works at RQNX IT
Every step is recorded in the erasure log and can be traced per serial number in your dossier.

1
Inventory and planning
Every device recorded by serial number, decommissioning planned per rack or room

2
De-racking, erasure and destruction
Servers, storage and network equipment dismantled, every drive erased or destroyed according to NIST SP 800-88

3
Dossier and residual value
Registration report, certificates per device and residual value settlement for usable hardware

Questions about data centre decommissioning
Does the data centre need to be cleared all at once?
No. We usually plan the decommissioning in phases per rack or room, so critical systems stay online as long as possible.
How do you register so much equipment?
Every device is recorded by serial number, model and type when de-racked, before it goes on to erasure, destruction or remarketing.
What happens to usable servers and storage?
They are valued and bought back through remarketing, after erasure of all drives with a certificate. The residual value is paid out or offset.
Can you also process network equipment?
Yes. Network equipment with internal storage is erased or destroyed in the same way; the rest goes to certified recycling.
Request a quote for the decommissioning of your data centre, or request a free valuation first. We respond within one working day. Other services: Data erasure, On-site data destruction, Hard drive shredding, SSD destruction.
Email us
Response within one working day
info@rqnx-it.com
Visiting address (example)
Mon to Fri, 8.00 to 17.30
Industrieweg 12, 3542 AD Utrecht (example address)
Call us
Prefer to talk directly?
030 123 45 67 (example number)
Request a quote or collection
Send a list of device types and quantities, or describe the situation.